split | cumulative total | |||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
# | dist | time | place | delta | score | lost* | pace | dist | time | place | delta | pace | comments | |||||||||||||||||||||
1. | 600m | 5:52 | 1 | -21 | -6% | 30 | 9:46 | 600m | 5:52 | 1 | -21 | -6% | 9:46 | Misread how high the control was and took the trail over the top of the spur. Around would have been faster. | ||||||||||||||||||||
2. | 890m | 6:59 | 2 | +38 | 10% | 7:50 | 1490m | 12:51 | 2 | +17 | 2% | 8:37 | Up to the trail and then ran down the spur to the right. | |||||||||||||||||||||
3. | 750m | 7:25 | 2 | +40 | 10% | 45 | 9:53 | 2240m | 20:16 | 2 | +57 | 5% | 9:02 | Went too far left leaving the control, which meant I went over the bottom part of an extra spur. Followed the ridge to the control. | ||||||||||||||||||||
4. | 830m | 7:52 | 1 | -44 | -9% | 9:28 | 3070m | 28:08 | 2 | +13 | 1% | 9:09 | Straight. Thought about going left to miss the vegetation, bit coming down the hillside, I could see that it was nothing. | |||||||||||||||||||||
5. | 450m | 3:15 | 1 | -59 | -23% | 7:13 | 3520m | 31:23 | 1 | -46 | -2% | 8:54 | Stayed left to run along the stream. | |||||||||||||||||||||
6. | 600m | 4:56 | 1 | -1:19 | -21% | 8:13 | 4120m | 36:19 | 1 | -2:05 | -5% | 8:48 | Upper trail around and down the spur. | |||||||||||||||||||||
7. | 460m | 3:04 | 2 | +22 | 14% | 6:40 | 4580m | 39:23 | 1 | -1:43 | -4% | 8:35 | Straight. The vegetation in the valley was fine, but did lose a few seconds going around a pond at the foot of the dam. Still probably faster than taking the trail. | |||||||||||||||||||||
8. | 510m | 3:47 | 2 | +3 | 1% | 7:25 | 5090m | 43:10 | 1 | -1:40 | -4% | 8:28 | Straight again, but this time the vegetation did slow me down a bit. Also failed to recognize the stream crossing, but found a reasonably fast crossing point. | |||||||||||||||||||||
9. | 340m | 1:56 | 1 | -1:14 | -39% | 5:41 | 5430m | 45:06 | 1 | -2:54 | -6% | 8:18 | Basically straight, taking the footbridges over the stream and around the right side of the building. |
* red = reported, gray = calculated