Strength 2:00:00 [3]
Dragging all of my gear from the truck to the timing hut. Wouldn't have been so bad, but all the drifting snow made the sled get stuck all the time. For the last run with the 150+ lb main timing case, Ken and Carl helped push and pull.
Got the heat turned on in the timing hut, and was able to unpack most of the gear in comfort. Everything seems to have made it ok, at least the main timers powered up and printed times ok, and all the cabling to the computer was working. One minor problem with getting the cables out to the start. The pipe through the hut wall doesn't fit a db25 connector. I'm going to have to try and take the shell off and feed it through crushed sideways a bit.