spent most of the day moving a 24 cubic yard pile of mush to various spots in the yard. (still about 10 yards left)
- Fill wheelbarel with about 70-80 pounds of mulch
- push it to location
- Dump it or shovel it into the spot
- repeat for 7 hours
Good flavor of what it would be like if you were doing hard labor in a siberian labor camp.