In the 1 days ending May 14, 2017:
Surveying 4:00:00 [0]
Trail/terrain running 1:56:00 intensity: (51:00 @1) + (1:05:00 @2) 18.5 km (6:16 / km) +1100m 4:50 / km
« Earlier | Later »